THE MAIN OBJECTIVE OF OUR PROJECT WAS TO INCORPORATE NEW TECHNOLOGIES TO MEET THE EVOLVING REQUIREMENTS OF HIGH- PERFORMANCE COMPUTING.
F E A T U R E units to supply chilled water to the new data centre infrastructure.
Solution
Vertiv supplied a variety of power equipment, air conditioning solutions for servers, storage, network components and services, including four Vertiv DCC containment solutions for corridor closures. In terms of cooling, the hybrid solution includes 20 Vertiv Liebert CRV units and two Vertiv Liebert PDX-PI direct expansion floor-mount cooling systems with variable speed compressors, as well as three Liebert XDU liquid cooling units, which control the temperature and flow of the refrigerant to the servers in a directto-chip application.
Vertiv also supplied various power supply and storage units, including two Vertiv Liebert APM 500 kVA uninterruptible power supply systems and valveregulated lead-acid batteries, eight Vertiv
Liebert RXA switchgear units, a 400 kW Power Module prefab solution, 76 Vertiv Geist switched power distribution units( PDUs) and 38 Vertiv VR racks. The interior space was completed with fire detection and extinguishing systems and a 630 kW generator set integrated with the Power Module.
Additionally, Vertiv provided consulting, design, installation and commissioning
“ services, including the integration of Vertiv Environet Alert software, which allows the customer to remotely monitor the entire infrastructure.
Results
Improved energy efficiency has been achieved through the implementation of strategies such as closing cold aisles and adopting hybrid cooling, a cutting-
THE MAIN OBJECTIVE OF OUR PROJECT WAS TO INCORPORATE NEW TECHNOLOGIES TO MEET THE EVOLVING REQUIREMENTS OF HIGH- PERFORMANCE COMPUTING.