Intelligent Data Centres Issue 09 | Page 64

UNCOVERING THE LAYERS to delivering a smart and comprehensive power security solution for Amdocs. “This enabled the construction of their data centre within the confines of their budget and proposed timeline – an achievement we are very proud of. Additionally the cold aisle containment function was a bespoke design that was created after the power quality items were successfully installed and we’re pleased to know that this additional feature will enhance the data centre’s overall energy efficiency.” Amdocs also requested isolation transformers in the data centre, which Eaton provided, to ensure electrical isolation for the system and prevent downstream issues due the building four- pole main circuit breaker. In the second phase of the installation, Eaton built the electrical panel, which is future proof. This eliminates the need to interrupt the data centre’s operation during any future expansion and 64 Issue 09 incorporates all of Amdocs’ requirements for the building infrastructure, IT, generator and bypass facilities. The panel is based on the Eaton xEnergy LV Switch system, which is designed to meet constantly increasing requirements, providing optimum conditions for building infrastructure up to 5000 A. Amdocs also chose Eaton’s Green Care Service Contract, which provides comprehensive protection through remote monitoring and maintenance and guarantees that Eaton would be onsite within four hours in the case of any events. Results The move was completed within the 90- day timeframe and the modern facility is now operating successfully using the new power management concept. Amdocs will be using this data centre set up as a model for the development of its other data centre projects around the world. Ronnen Perry, Global Technical Manager and Regional Facility Manager at Amdocs, said: “I have technical engineering responsibility for Amdocs data centres worldwide and I can honestly say that my experience with this project ranks with the best that I’ve worked with. The outstanding efforts of Eaton and Carter Sullivan made it possible to complete the Amdocs data centre on schedule and on budget.” The data centre is delivering cost savings already. It uses Eaton’s Variable Module Management System (VMMS), which increases efficiency without compromising reliability. This new data centre has the lowest PUE in Amdocs world-wide. Amdocs has recently implemented a second UPS for the B-side of the data centre and is looking to roll out this approach in other data centres around the world. ◊ www.intelligentdatacentres.com