ADVANCED DATA CENTER COOLING FROM EXCOOL
 • 50 % + savings in capital cost vs chilled water systems
 • Lightweight and compact footprint manufactured from Stainless Steel and Composite materials
 • Approaching 2000 units installed throughout the world cooling over 500MW of Data Centre space
 250 to 400kW
 • Rapid deployment allowing simple installation and set up
 • Reduce overall water consumption of the data center
 • Low connected power , reducing the size of generators and power distribution infrastructure
 • Optimised manufacturing for reduced delivery time Typical delivery period 16-20 weeks
 • Onboard water treatment and 24hr water storage
 400 to 600kW
 Excool Global HQ , Bromsgrove UK . Excool North American HQ , Greer South Carolina .
 8 www . intelligentdatacentres . com